United States · Evidence grade B
United States
The default estimate is $24 per million output tokens, ranking 6 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $24
Default rank #6
Difference from leader +4.1%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $24 | 6 of 45 |
| 100 MW data center | Long context | $52 | 5 of 45 |
| 100 MW data center | Agentic engineering | $116 | 5 of 45 |
| On-prem solution | General inference | $32 | 6 of 45 |
| On-prem solution | Long context | $70 | 6 of 45 |
| On-prem solution | Agentic engineering | $157 | 6 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.