European Union · Evidence grade B

Cyprus

The default estimate is $29 per million output tokens, ranking 44 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $29
Default rank #44
Difference from leader +26.0%
DeploymentWorkloadCostRank
100 MW data center General inference $29 44 of 45
100 MW data center Long context $64 44 of 45
100 MW data center Agentic engineering $143 44 of 45
On-prem solution General inference $37 44 of 45
On-prem solution Long context $83 44 of 45
On-prem solution Agentic engineering $188 44 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology