European Union · Evidence grade B
Cyprus
The default estimate is $29 per million output tokens, ranking 44 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $29
Default rank #44
Difference from leader +26.0%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $29 | 44 of 45 |
| 100 MW data center | Long context | $64 | 44 of 45 |
| 100 MW data center | Agentic engineering | $143 | 44 of 45 |
| On-prem solution | General inference | $37 | 44 of 45 |
| On-prem solution | Long context | $83 | 44 of 45 |
| On-prem solution | Agentic engineering | $188 | 44 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.