European Union · Evidence grade B

Croatia

The default estimate is $26 per million output tokens, ranking 34 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $26
Default rank #34
Difference from leader +15.5%
DeploymentWorkloadCostRank
100 MW data center General inference $26 34 of 45
100 MW data center Long context $58 33 of 45
100 MW data center Agentic engineering $130 33 of 45
On-prem solution General inference $34 31 of 45
On-prem solution Long context $75 30 of 45
On-prem solution Agentic engineering $170 30 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology