European Union · Evidence grade B

Poland

The default estimate is $26 per million output tokens, ranking 31 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $26
Default rank #31
Difference from leader +14.1%
DeploymentWorkloadCostRank
100 MW data center General inference $26 31 of 45
100 MW data center Long context $57 30 of 45
100 MW data center Agentic engineering $129 30 of 45
On-prem solution General inference $34 26 of 45
On-prem solution Long context $75 27 of 45
On-prem solution Agentic engineering $169 27 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology