The default estimate is $25 per million output tokens, ranking 24 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $25
Default rank #24
Difference from leader +11.0%
DeploymentWorkloadCostRank
100 MW data center General inference $25 24 of 45
100 MW data center Long context $56 26 of 45
100 MW data center Agentic engineering $126 26 of 45
On-prem solution General inference $34 29 of 45
On-prem solution Long context $75 31 of 45
On-prem solution Agentic engineering $171 32 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.