European Union · Evidence grade B

Greece

The default estimate is $27 per million output tokens, ranking 38 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $27
Default rank #38
Difference from leader +17.2%
DeploymentWorkloadCostRank
100 MW data center General inference $27 38 of 45
100 MW data center Long context $59 36 of 45
100 MW data center Agentic engineering $132 36 of 45
On-prem solution General inference $34 35 of 45
On-prem solution Long context $77 35 of 45
On-prem solution Agentic engineering $173 35 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology