European Union · Evidence grade B
Greece
The default estimate is $27 per million output tokens, ranking 38 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $27
Default rank #38
Difference from leader +17.2%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $27 | 38 of 45 |
| 100 MW data center | Long context | $59 | 36 of 45 |
| 100 MW data center | Agentic engineering | $132 | 36 of 45 |
| On-prem solution | General inference | $34 | 35 of 45 |
| On-prem solution | Long context | $77 | 35 of 45 |
| On-prem solution | Agentic engineering | $173 | 35 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.