European Union · Evidence grade B

Malta

The default estimate is $27 per million output tokens, ranking 40 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $27
Default rank #40
Difference from leader +19.2%
DeploymentWorkloadCostRank
100 MW data center General inference $27 40 of 45
100 MW data center Long context $60 40 of 45
100 MW data center Agentic engineering $134 41 of 45
On-prem solution General inference $35 40 of 45
On-prem solution Long context $78 41 of 45
On-prem solution Agentic engineering $176 41 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.