European Union · Evidence grade B

Luxembourg

The default estimate is $25 per million output tokens, ranking 12 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $25
Default rank #12
Difference from leader +8.5%
DeploymentWorkloadCostRank
100 MW data center General inference $25 12 of 45
100 MW data center Long context $54 14 of 45
100 MW data center Agentic engineering $122 14 of 45
On-prem solution General inference $33 20 of 45
On-prem solution Long context $73 21 of 45
On-prem solution Agentic engineering $166 21 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology