European Union · Evidence grade B

Finland

The default estimate is $23 per million output tokens, ranking 1 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $23
Default rank #1
Difference from leader +0.0%
DeploymentWorkloadCostRank
100 MW data center General inference $23 1 of 45
100 MW data center Long context $50 1 of 45
100 MW data center Agentic engineering $112 1 of 45
On-prem solution General inference $30 2 of 45
On-prem solution Long context $66 2 of 45
On-prem solution Agentic engineering $150 2 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology