Asia · Evidence grade B

Taiwan

The default estimate is $24 per million output tokens, ranking 9 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $24
Default rank #9
Difference from leader +7.1%
DeploymentWorkloadCostRank
100 MW data center General inference $24 9 of 45
100 MW data center Long context $53 8 of 45
100 MW data center Agentic engineering $120 8 of 45
On-prem solution General inference $32 8 of 45
On-prem solution Long context $71 9 of 45
On-prem solution Agentic engineering $160 9 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology