North America · Evidence grade C

Canada

The default estimate is $24 per million output tokens, ranking 7 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $24
Default rank #7
Difference from leader +4.9%
DeploymentWorkloadCostRank
100 MW data center General inference $24 7 of 45
100 MW data center Long context $52 7 of 45
100 MW data center Agentic engineering $117 7 of 45
On-prem solution General inference $32 7 of 45
On-prem solution Long context $70 5 of 45
On-prem solution Agentic engineering $157 5 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology