European Union · Evidence grade B

Bulgaria

The default estimate is $26 per million output tokens, ranking 33 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $26
Default rank #33
Difference from leader +15.4%
DeploymentWorkloadCostRank
100 MW data center General inference $26 33 of 45
100 MW data center Long context $58 32 of 45
100 MW data center Agentic engineering $129 31 of 45
On-prem solution General inference $34 28 of 45
On-prem solution Long context $75 26 of 45
On-prem solution Agentic engineering $168 26 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology