The default estimate is $25 per million output tokens, ranking 15 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $25
Default rank #15
Difference from leader +9.5%
DeploymentWorkloadCostRank
100 MW data center General inference $25 15 of 45
100 MW data center Long context $55 16 of 45
100 MW data center Agentic engineering $124 19 of 45
On-prem solution General inference $33 25 of 45
On-prem solution Long context $74 25 of 45
On-prem solution Agentic engineering $168 25 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.