The default estimate is $26 per million output tokens, ranking 35 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $26
Default rank #35
Difference from leader +16.3%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $26 | 35 of 45 |
| 100 MW data center | Long context | $59 | 35 of 45 |
| 100 MW data center | Agentic engineering | $132 | 35 of 45 |
| On-prem solution | General inference | $35 | 37 of 45 |
| On-prem solution | Long context | $77 | 38 of 45 |
| On-prem solution | Agentic engineering | $175 | 38 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.