Other · Evidence grade C

Brazil

The default estimate is $32 per million output tokens, ranking 45 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $32
Default rank #45
Difference from leader +41.8%
DeploymentWorkloadCostRank
100 MW data center General inference $32 45 of 45
100 MW data center Long context $70 45 of 45
100 MW data center Agentic engineering $158 45 of 45
On-prem solution General inference $41 45 of 45
On-prem solution Long context $90 45 of 45
On-prem solution Agentic engineering $203 45 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology