Europe · Evidence grade B

Norway

The default estimate is $23 per million output tokens, ranking 4 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $23
Default rank #4
Difference from leader +2.1%
DeploymentWorkloadCostRank
100 MW data center General inference $23 4 of 45
100 MW data center Long context $51 4 of 45
100 MW data center Agentic engineering $114 4 of 45
On-prem solution General inference $31 4 of 45
On-prem solution Long context $68 4 of 45
On-prem solution Agentic engineering $154 4 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology