Other · Evidence grade B
Saudi Arabia
The default estimate is $25 per million output tokens, ranking 14 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $25
Default rank #14
Difference from leader +8.8%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $25 | 14 of 45 |
| 100 MW data center | Long context | $54 | 12 of 45 |
| 100 MW data center | Agentic engineering | $121 | 11 of 45 |
| On-prem solution | General inference | $32 | 9 of 45 |
| On-prem solution | Long context | $70 | 8 of 45 |
| On-prem solution | Agentic engineering | $159 | 8 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.