European Union · Evidence grade B

Latvia

The default estimate is $25 per million output tokens, ranking 27 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $25
Default rank #27
Difference from leader +11.8%
DeploymentWorkloadCostRank
100 MW data center General inference $25 27 of 45
100 MW data center Long context $56 25 of 45
100 MW data center Agentic engineering $125 25 of 45
On-prem solution General inference $33 19 of 45
On-prem solution Long context $73 19 of 45
On-prem solution Agentic engineering $164 19 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology