European Union · Evidence grade B
Lithuania
The default estimate is $25 per million output tokens, ranking 26 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $25
Default rank #26
Difference from leader +11.4%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $25 | 26 of 45 |
| 100 MW data center | Long context | $56 | 24 of 45 |
| 100 MW data center | Agentic engineering | $125 | 23 of 45 |
| On-prem solution | General inference | $33 | 17 of 45 |
| On-prem solution | Long context | $73 | 18 of 45 |
| On-prem solution | Agentic engineering | $164 | 20 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.