North America · Evidence grade C

Mexico

The default estimate is $28 per million output tokens, ranking 42 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $28
Default rank #42
Difference from leader +21.6%
DeploymentWorkloadCostRank
100 MW data center General inference $28 42 of 45
100 MW data center Long context $60 42 of 45
100 MW data center Agentic engineering $136 42 of 45
On-prem solution General inference $35 41 of 45
On-prem solution Long context $78 40 of 45
On-prem solution Agentic engineering $176 40 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology