North America · Evidence grade C
Mexico
The default estimate is $28 per million output tokens, ranking 42 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $28
Default rank #42
Difference from leader +21.6%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $28 | 42 of 45 |
| 100 MW data center | Long context | $60 | 42 of 45 |
| 100 MW data center | Agentic engineering | $136 | 42 of 45 |
| On-prem solution | General inference | $35 | 41 of 45 |
| On-prem solution | Long context | $78 | 40 of 45 |
| On-prem solution | Agentic engineering | $176 | 40 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.