The default estimate is $24 per million output tokens, ranking 11 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $24
Default rank #11
Difference from leader +7.8%
DeploymentWorkloadCostRank
100 MW data center General inference $24 11 of 45
100 MW data center Long context $54 10 of 45
100 MW data center Agentic engineering $120 9 of 45
On-prem solution General inference $32 11 of 45
On-prem solution Long context $71 10 of 45
On-prem solution Agentic engineering $160 10 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology