European Union · Evidence grade B

Sweden

The default estimate is $23 per million output tokens, ranking 2 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $23
Default rank #2
Difference from leader +1.3%
DeploymentWorkloadCostRank
100 MW data center General inference $23 2 of 45
100 MW data center Long context $50 3 of 45
100 MW data center Agentic engineering $113 3 of 45
On-prem solution General inference $31 3 of 45
On-prem solution Long context $68 3 of 45
On-prem solution Agentic engineering $153 3 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology