European Union · Evidence grade B
Czechia
The default estimate is $25 per million output tokens, ranking 28 of 45 countries for general inference in a 100 MW data center.
Scenario results
Default cost $25
Default rank #28
Difference from leader +12.0%
| Deployment | Workload | Cost | Rank |
|---|---|---|---|
| 100 MW data center | General inference | $25 | 28 of 45 |
| 100 MW data center | Long context | $56 | 28 of 45 |
| 100 MW data center | Agentic engineering | $126 | 28 of 45 |
| On-prem solution | General inference | $33 | 21 of 45 |
| On-prem solution | Long context | $74 | 22 of 45 |
| On-prem solution | Agentic engineering | $167 | 22 of 45 |
All values are US dollars per million output tokens. Rankings are recalculated for every scenario.
How to read this estimate
Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.