European Union · Evidence grade B

Ireland

The default estimate is $26 per million output tokens, ranking 30 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $26
Default rank #30
Difference from leader +13.8%
DeploymentWorkloadCostRank
100 MW data center General inference $26 30 of 45
100 MW data center Long context $57 31 of 45
100 MW data center Agentic engineering $129 32 of 45
On-prem solution General inference $35 38 of 45
On-prem solution Long context $78 39 of 45
On-prem solution Agentic engineering $176 39 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.

Read methodology