Asia · Evidence grade C

India

The default estimate is $28 per million output tokens, ranking 43 of 45 countries for general inference in a 100 MW data center.

Scenario results

Default cost $28
Default rank #43
Difference from leader +25.4%
DeploymentWorkloadCostRank
100 MW data center General inference $28 43 of 45
100 MW data center Long context $62 43 of 45
100 MW data center Agentic engineering $139 43 of 45
On-prem solution General inference $36 43 of 45
On-prem solution Long context $80 43 of 45
On-prem solution Agentic engineering $179 42 of 45

All values are US dollars per million output tokens. Rankings are recalculated for every scenario.

How to read this estimate

Country-level inputs are screening proxies. Site selection requires hardware quotes, a utility connection study, a large-load tariff or PPA and a reproducible production benchmark.